Discussion:
Error code 2.004

Hi everybody,

May I know what does the error code 2.004 means?

Thank you
  • Posted 8 Feb 2018 18:35
  • By hongchien_l
  • joined 8 Feb'18 - 1 message
  • Singapore, Singapore
Showing items 1 - 1 of 1 results.
Very common on new BT models, it's just a mismatch between main controller and display. Won't affect the trucks operation.
  • Posted 20 Aug 2019 05:01
  • By Roibeard
  • joined 2 Mar'10 - 335 messages
  • Dublin, Ireland

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Upcoming in the editorial calendar
MANAGING MIXED FLEETS
Oct 2025
ASSET FINANCE
Nov 2025
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Toplift Ferrari TFC36-48
Stoney Creek, Ontario, Canada
Used - Sale
USD1
Toyota 8FGU25
Flesherton, Ontario, Canada
Used - Sale

PREMIUM business

BSL New Energy Technology Co., Ltd
BSLBATT - practical expertise and excellent design in the industrial lithium-ion battery market.
Upcoming in the editorial calendar
MANAGING MIXED FLEETS
Oct 2025
ASSET FINANCE
Nov 2025
Toplift Ferrari TFC36-48
Stoney Creek, Ontario, Canada
Used - Sale
USD1
Toyota 8FGU25
Flesherton, Ontario, Canada
Used - Sale
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.