Discussion:
CATERPILLAR FORKLIFT V50D

I HAVE A CATERPILLAR FORKLIFT MODEL V50D SERIAL NUMBER 3EC07160 WITH A PEUGOT ENGINE NUMBER XN1P IT IS BOTH GASOLINE AND LP.

I NEED TO RUN THE RACK ON THE VALVES. (ADJUST THE ENGINE VALVES ON TOP OF THE HEAD. CAN SOMEONE PLEASE TELL ME THE TOLLERANCE (specifications) ON THE GUGE I NEED TO USE.

I ALSO NEED TO KNOW THE GAP ON THE SPARK PLUGS.

THANK YOU FOR ALL YOUR HELP.

RUBEN
  • Posted 4 Mar 2012 15:09
  • By ruben_c
  • joined 4 Mar'12 - 3 messages
  • New Mexico, United States
Showing items 1 - 2 of 2 results.
actually the valve clearances are as follows
(they must be adjusted while engine is cold)
Intake: 0.10mm (.004in)
Exhaust: 0.25mm (.010in)

Torque on the nuts are:12.5 - 17.5 N.m (9 - 13 ft lbs)

Spark plug gap:
Gas: 0.6mm (.024in)
LP: 0.4 - 0.5mm (.016 -.020in)
Dual Fuel: 0.6mm (.024in)
spark plug torque: 22.5 - 25.0 N.m (16.5 - 18 ft lbs)
  • Posted 7 Mar 2012 16:38
  • By Jplayer
  • joined 12 Apr'07 - 407 messages
  • North Carolina, United States
John Player Jr
_________________
LiftOne, LLC
Charlotte, NC
Email: jplayer@liftone.net
Valve clearance is.012" on intake and exhaust. Spark plugs is.028-.030".
  • Posted 4 Mar 2012 21:56
  • By mrfixit
  • joined 11 Dec'08 - 1,434 messages
  • New York, United States

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Mitsubishi Logisnext FD25T5M
Yokohama, Japan
Used - Sale
Tusk 500PGH14
Morgantown, Pennsylvania, United States
Used - Sale
Upcoming industry events …
February 5-7, 2026 - Mumbai, India
April 14-16, 2026 - São Paulo, Brazil
June 9-11, 2026 - Johannesburg, South Africa
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY