Discussion:
ZAPI YALE MR16

Hello Friends!
I'm having a problem yale mr16.o EPS works 3 or 4 days and re-enters in short, all hydraulic functions work except the function of lifting, lowering this ok! (hydraulic this ok)
also'll need the wiring diagram of the MR16 yale.
grateful for comprehension
hugs
DiDomenico
  • Posted 23 Nov 2012 23:48
  • By didomenico
  • joined 23 Nov'12 - 14 messages
  • RS, Brazil
Showing items 1 - 3 of 3 results.
AAPEE Hello!
defective lifting already solved. The defect was MHYRIO module.
just do not know why the EPS is short-circuited after 3 or 4 days of use.
grateful
  • Posted 27 Nov 2012 00:22
  • By didomenico
  • joined 23 Nov'12 - 14 messages
  • RS, Brazil
not lifting is mostly lift interupt with zapi handset turn off.eps possible first check reach wire and coils +witch code?
  • Posted 25 Nov 2012 02:20
  • By AAPEE
  • joined 28 Aug'12 - 76 messages
  • Brussels, Belgium
Hello Friends!
on the lifting of MR 16, already decided, the module was mhyrio faulty resistor and mosfet open at exit 7 of the same.
Now I'm worried because I do not know if the EPS will work long, someone would know why the EPS come easily shorted?
would have any permanent solution for this? (short circuit power EPS \ AC ZAPI)
very grateful for the information
DiDomenico
  • Posted 24 Nov 2012 10:21
  • By didomenico
  • joined 23 Nov'12 - 14 messages
  • RS, Brazil

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Hyster-Yale to lower production Cleveland, OH, United States
Upcoming industry events …
February 5-7, 2026 - Mumbai, India
April 14-16, 2026 - São Paulo, Brazil
June 9-11, 2026 - Johannesburg, South Africa
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.