Discussion:
BT RRB3 Reach truck with lift fault

I have got a BT reach truck with 8500mm mast with full free lift. The mast free lift doesn't work as it should before the carriage reaches it maximum the second stage starts to lift. The fault is worse with a load on. The carriage bearings have been changed and the carraige runs very smooth. The lift cylinder has been stripped checked and resealed and the flow control valve in the cylinder has also been changed. Any help would be appriciated.
  • Posted 11 Apr 2013 20:54
  • By Leon_W
  • joined 7 Sep'07 - 326 messages
  • Tyne & Wear, United Kingdom
Showing items 1 - 4 of 4 results.
The fault turned out to be a faulty chain pulley.
  • Posted 15 Apr 2013 18:52
  • By Leon_W
  • joined 7 Sep'07 - 326 messages
  • Tyne & Wear, United Kingdom
Free lift cylinder has been checked and resealed. There wasn't a problem with it but we resealed just incase there was something we missed.
  • Posted 12 Apr 2013 18:17
  • By Leon_W
  • joined 7 Sep'07 - 326 messages
  • Tyne & Wear, United Kingdom
Seems to be a problem of internal leakage in freelift cylinder.

Try to pull out the thin tecalan hose from roller chain, if excess oil flows through this hose you have internal leakages in cylinder

Good luck
  • Posted 12 Apr 2013 04:37
  • By nacsand_n
  • joined 20 Sep'09 - 716 messages
  • Madrid, Spain
Seen this before on a RR E3 with 8 metre triplex mast & it was the freelift cylinder defective.

The one we had if there was any weight on the forks the main lift would reach its full extension before the freelift would even move.
  • Posted 11 Apr 2013 21:50
  • By Forkingabout
  • joined 31 Mar'11 - 862 messages
  • england, United Kingdom

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

PREMIUM business

Noblelift
Global leader and manufacturer of high quality electric, lithium-ion, and IC material handling equipment.
Global Industry News
edition #1240 - 24 July 2025
CeMAT Australia 2025 has been underway in Sydney this week, wrapping up today, with the main topics coming out of the event proving to be the very predictable automation and sustainability... Continue reading
Movers & Shakers
Simon Manasseh Simon Manasseh
VP business development for Europe, Noblelift Intelligent Equipment Co
Regional business manager, Doosan Bobcat Material Handling
President and CEO Swisslog Americas, Swisslog
Vice president, Newgentech Material Handling India
Global Industry News
edition #1240 - 24 July 2025
CeMAT Australia 2025 has been underway in Sydney this week, wrapping up today, with the main topics coming out of the event proving to be the very predictable automation and sustainability... Continue reading
Toyota 8FGU25
Flesherton, Ontario, Canada
Used - Sale
SMV (Konecranes) 4531CC5
Balling, Denmark
Used - Sale

PREMIUM business

Noblelift
Global leader and manufacturer of high quality electric, lithium-ion, and IC material handling equipment.
Toyota 8FGU25
Flesherton, Ontario, Canada
Used - Sale
SMV (Konecranes) 4531CC5
Balling, Denmark
Used - Sale
Global Industry News
edition #1240 - 24 July 2025
CeMAT Australia 2025 has been underway in Sydney this week, wrapping up today, with the main topics coming out of the event proving to be the very predictable automation and sustainability... Continue reading
Upcoming in the editorial calendar
WIRELESS CHARGING
Aug 2025
MANAGING MIXED FLEETS
Oct 2025