Discussion:
Code E 01-4

"You've probably already figured out that the battery negative must be removed, pins E1 ( looking at it, 2nd column from left middle contact) must be shorted with TC (top half circle contact). Reconnect negative terminal, key on engine off and fully depress and release accelerator 5 times.

I had to adjust the idle screw after replacing both diaphragms in the air governor and replacing the filthy stone filter. Idle was very low. This hopefully takes care of your issues."

hi, can you help us. We have the same error 01-4, we decided to remove the error using the method you described above. when we opened the block, we did not find port E1, that is, there is space for the port, but the iron connector itself is missing, can you tell me how I can erase this error using another method?
loader model 02-8FGJF35 2023
  • Posted 9 Jul 2024 20:52
  • By alex_bande
  • joined 6 Feb'24 - 6 messages
  • Moldova, Republic Of
hello 2 all
Showing items 1 - 1 of 1 results.
i resolved

Set the fuel switch to LPG

Bridge - connect the TC and E12 pin contacts (foto)

Turn the key to the ON position

Depress the accelerator pedal 5 times

Switch off the ignition with the key for a few seconds

Remove connect-bridge

Now it should be OK.
  • Posted 9 Jul 2024 22:47
  • By alex_bande
  • joined 6 Feb'24 - 6 messages
  • Moldova, Republic Of
hello 2 all

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Upcoming industry events …
February 5-7, 2026 - Mumbai, India
April 14-16, 2026 - São Paulo, Brazil
June 9-11, 2026 - Johannesburg, South Africa
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.