Discussion:
Code 336

Pot reading from 10.8 down to 3.3 on analizer... customer installed. think it should start @more than.05? And go up.. is this correct? Pot installed 180*out?
  • Posted 21 Feb 2019 13:01
  • By Slsafut
  • joined 21 Feb'19 - 1 message
  • Utah, United States
Showing items 1 - 2 of 2 results.
In my case POT was ok, The FF switch was stuck on.- inspect the gear for POT, if it's worn out, you will get this code. luckily i had another 4500 we retired. swapped the hole handle. code never returned.
  • Posted 1 Feb 2025 02:56
  • By Rocket_420
  • joined 1 Feb'25 - 3 messages
  • Alberta, Canada
Rocket_sine
In my experience, the lift solenoid welds shut sounds crazy but try changing the solenoid
  • Posted 6 Dec 2019 23:42
  • By deanod
  • joined 10 Jul'18 - 6 messages
  • Illinois, United States
Dean Davison

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Global Industry News
edition #1258 - 27 November 2025
In this week’s Forkliftaction News , we report on Hyster-Yale laying off staff in the US amid what it describes as “challenging market conditions”... Continue reading
Aichi SR10C1SM
Yokohama, Japan
Used - Sale
JLG G12-55A
Morgantown, Pennsylvania, United States
Used - Sale & Hire

PREMIUM business

MAXAM Tire, Inc.
Simplify your productivity with MAXAM's range of performance material handling tires, designed with the latest EcoPoint3 technology.
Fact of the week
According to studies published in the English Journal of Medicine, the impact of daylight savings is revealed by a 24% increase in heart attacks on the Monday following the spring shift forward. When clocks move back in autumn, heart attacks drop by about 21%, suggesting that loss of sleep is an important driver.
Upcoming industry events …
December 4–7, 2025 - Goyang, Korea, Republic Of
March 10-12, 2026 - Hong Kong, Hong Kong
June 30-July 2, 2026 - Birmingham, United Kingdom
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY