Report this forum post

The right side reach extension cylinder is leaking and will need to be removed, resealed, and reinstalled. Is there a procedure for synching the left and right reach cylinders during re-installation to avoid binding and to ensure that the left and right cylinders are moving in and out at the same speed/length?
  • Posted 28 Jul 2016 23:56
  • By BPWtech
  • joined 28 Jul'16 - 1 message
  • Pennsylvania, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Global Industry News
edition #1261 - 18 December 2025
In this week’s Forkliftaction News , we report on an activist investment firm increasing its stake in Toyota Industries Corp (TICO), in a bid to stop the privatisation of the materials handling equipment manufacturer... Continue reading
Fact of the week
The two internal cavities in our nose called nostrils function as separate organs. Each nostril has its own set of turbinates and olfactory receptors. The two independent organs work together through a mechanism called the nasal cycle, where one nostril is dominant for air intake while the other rests and is better at detecting scents.
Latest job alerts …
Bensenville, United States
Bensenville, United States
Monmouth, IL, United States
Fact of the week
The two internal cavities in our nose called nostrils function as separate organs. Each nostril has its own set of turbinates and olfactory receptors. The two independent organs work together through a mechanism called the nasal cycle, where one nostril is dominant for air intake while the other rests and is better at detecting scents.