Report this forum post

If you read my article in the Safety 1st column last week, you would have noted that in situations as noted above may require a different system of competency. If he did 'okay' at the end, maybe he is a low level competent person meaning he should only be dealt menial tasks, and more difficult tasks handed out to the experienced, or better operators. With time, hiopefully, his skills will improve and then his supervisor can dole out more difficult tasks. That is what I do.
  • Posted 21 Mar 2008 03:33
  • By dan_m
  • joined 14 Oct'05 - 337 messages
  • Ontario, Canada

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY

PREMIUM business

ROYPOW
Manufacturer of lithium forklift battery solutions, the global leader in the market of lithium batteries replacing lead acid batteries.
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY

PREMIUM business

ROYPOW
Manufacturer of lithium forklift battery solutions, the global leader in the market of lithium batteries replacing lead acid batteries.
Latest job alerts …
Fact of the week
According to studies published in the English Journal of Medicine, the impact of daylight savings is revealed by a 24% increase in heart attacks on the Monday following the spring shift forward. When clocks move back in autumn, heart attacks drop by about 21%, suggesting that loss of sleep is an important driver.