Report this forum post

United States I have a Linde E-18 purchased new in 2012. At 1300 hours (hours are accurate) it blew out an O-Ring in the manifold under the floor board. Once the repair on this was complete, a lift cylinder seal failed as well. This machine is operated in a clean environment and is not overloaded, or pushed to the max lift capacity.

Anyone have ideas why this is happening?
Lift cylinder has not been repaired, yet. How difficult is it to remove and put new seal in?

This was still under warranty. However, I discovered that there is no warranty on hydraulics, drive train only.
  • Posted 24 Sep 2014 03:04
  • By stan_k
  • joined 23 Sep'14 - 8 messages
  • Wisconsin, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading
Fact of the week
Foundling hatches are safe, anonymous drop-off points for unwanted infants, allowing parents in crisis a way to surrender a baby safely without fear of punishment, ensuring the child is rescued and cared for. The concept started in the 12th century, was abandoned in the late 19th century, then reintroduced in 1952. It has since been adopted in many countries.

PREMIUM business

MAXAM Tire, Inc.
Simplify your productivity with MAXAM's range of performance material handling tires, designed with the latest EcoPoint3 technology.
Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group