They're being deliveried on low-boy trailers,and all I have to do is crane them off to the ground,install the batteries,and do the make-ready. Should be able to all 5 units in one day,since I'll have help from a co-worker.
This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.