Hi there
Ive not been out to it yet, as most of my work is for the trade, i try talk the engineers through it before hand. if they cannot get it resolved then I have to make the trip out, this looks like one of those cases. I will mention this to them first, but failing that, it would be nice to have a wiring diagram if i need to go out to it.
Thanks for the advice, will check.
Regards
This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.