Report this forum post

My opinon after looking at all the pictures and watching the video is the time delay pcb is not working. Send it to controlelectric for repair :-). The 1st speed is working ok but the 2nd and 3rd speed contactors must be energized when the time delay lets them, and that isn't happening. If the foot switches for 2nd and 3rd speed seem ok then my guess is the time delay card.
  • Posted 27 Apr 2013 02:14
  • By mrfixit
  • joined 11 Dec'08 - 1,434 messages
  • New York, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Toyota 8FG25
Braeside, Melbourne, Victoria, Australia
Hire
Factory Cat MICROMAG20D
Morgantown, Pennsylvania, United States
Used - Sale

PREMIUM business

Hangzhou Maxlion Machinery Equipment Co., Ltd
3G Standard, Good Products, Good Price, Good Service.
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.

PREMIUM business

Hangzhou Maxlion Machinery Equipment Co., Ltd
3G Standard, Good Products, Good Price, Good Service.
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.