Report this forum post

Lishoy,
All I can tell you is that the system is saying that the battery consumption is to much and that you may have a small capacity battery. I think you need to test your battery and check for falling cell voltages. Also check for voltage drop at the line contractors but a low. Battery will stop your line contractors operating. If you do the self diagnostic routine stage 7 will check the battery voltage automatically in the display it will either put up 08 or 07, 08 is a pass and 07 is a fail.

Regards Patrick
  • Posted 26 Apr 2013 01:49
  • By Titus
  • joined 6 Jul'10 - 185 messages
  • North Yorkshire, United Kingdom

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
On the 88th day of the year, 29 March in a non-leap year and March 28th in a leap year, World Piano Day (also known as Piano Day) is celebrated. This date was chosen because a standard piano features 88 keys.

PREMIUM business

Tailift Material Handling USA Inc
Part of Toyota Industries Group - Leading manufacturer of High-quality machines.
Fact of the week
On the 88th day of the year, 29 March in a non-leap year and March 28th in a leap year, World Piano Day (also known as Piano Day) is celebrated. This date was chosen because a standard piano features 88 keys.
Mitsubishi FD200
Yokohama, Japan
Used - Sale
Taylor TE650S
Coraopolis, Pennsylvania, United States
Used - Sale & Hire

PREMIUM business

Tailift Material Handling USA Inc
Part of Toyota Industries Group - Leading manufacturer of High-quality machines.
Movers & Shakers
Simon Manasseh Simon Manasseh
VP business development for Europe, Noblelift Intelligent Equipment Co
Regional business manager, Doosan Bobcat Material Handling
President and CEO Swisslog Americas, Swisslog
Vice president, Newgentech Material Handling India