Report this forum post

I just (finished on Saturday ) installed a controller from Accelerated Systems Inc (navitas) The controller was very reasonable in cost I thought, was a pretty straight forward install. I guess time will tell how the durability is.
Thanks for the reply
Brent
  • Posted 4 Dec 2012 04:33
  • By debra_j
  • joined 17 May'08 - 7 messages
  • British Columbia, Canada

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
TCM FD115-3
Yokohama, Japan
Used - Sale
SMV (Konecranes) 4632CC5
Balling, Denmark
New - Sale

PREMIUM business

F. Uchiyama
Global exporter of used forklift and construction machinery, servicing over 80 countries.
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY