Report this forum post

?assume? you have already checked all power cables for 'shorts to frame' and fixed any short with less than 100k resistance.
Traction wheels off the ground, disconnect 1 wire from all accessory like headlights and backup alarm (open their circuit)
Confirm drive motors runs when 1a (bypass) and 1 direction contactor (and line contactor, if so equipped).
Confirm all connections to tb1 through tb6 getting correct voltage for the desired operation condition.
  • Posted 16 Oct 2012 21:01
  • By edward_t
  • joined 5 Mar'08 - 2,334 messages
  • South Carolina, United States
"it's not rocket surgery"

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine
Taylor T650L
Morgantown, Pennsylvania, United States
Used - Sale
Aichi SR18A
Yokohama, Japan
Used - Sale

PREMIUM business

Shenzhen Wellwit Robotics Co., Ltd
The Largest AMR/AGV ODM/OEM Manufacturer in China.
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading