Report this forum post

Thanks for the usefull info. Will order an operator's manual. I see you emphazied that water should be added "AFTER" the charge. Does this mean that I should wait until after the 8 hour cool off period to add the water? Would forklift be ready to use after this? I won't be using this forklift fulltime, but rather when needed and this may only be for an hour or so at a time and maybe ever couple of weeks.

Will the "fuel gauge" tell me when a recharge is needed or when will I know I should be recharging it? Sorry, but this is new to me. Thanks, Joe.
  • Posted 14 Sep 2012 10:59
  • By joetx
  • joined 14 Sep'12 - 23 messages
  • Texas, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
SMV (Konecranes) 4632CC5
Balling, Denmark
New - Sale
Toyota 8FD45
Yokohama, Japan
Used - Sale
Latest job alerts …
Muncie, IN, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY