Report this forum post

I currently am working in an account that is running Hyster H100XM with Balzoni paper roll clamps. We are experiencing lift chain breakage at low hours. I believe it to be an operational error with over loading. Has anyone seen this on the H100xm or H110xm?
  • Posted 9 Aug 2012 06:52
  • By edward_s
  • joined 9 Aug'12 - 1 message
  • Illinois, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Upcoming industry events …
September 24-25, 2025 - Tangiers, Morocco
September 25, 2025 - South Brisbane, QLD, Australia
October 23, 2025 - Atlanta, GA, United States
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.