I currently am working in an account that is running Hyster H100XM with Balzoni paper roll clamps. We are experiencing lift chain breakage at low hours. I believe it to be an operational error with over loading. Has anyone seen this on the H100xm or H110xm?
This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.