Report this forum post

We have a TLT30 that clocks about 125 hours per year. We have an annual thorough inspection done for us but do not know the maintenance interval for such a low usage machine (I understand it is 500 hours). What is the official manufacturer's recommendation so I can be safe and keep costs down but every four years does not look right!
  • Posted 26 Nov 2011 00:03
  • By Kederand
  • joined 25 Nov'11 - 2 messages
  • Co Durham, United Kingdom
Kederand

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine
Terberg YT222
Balling, Denmark
Used - Sale
Crown SX3030TT4250
Braeside, Melbourne, Victoria, Australia
Hire
Latest job alerts …
Muncie, IN, United States
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.