Report this forum post

The manager who looks after us site engineers allows 15 minutes before the end of shift for cleaning / putting tools away & then washing up / getting changed.

Also as long as the work is getting done on time does it really matter if they take a few extra minutes cleaning up? ? ?
  • Posted 9 Jun 2011 20:17
  • Modified 9 Jun 2011 20:19 by poster
  • By Forkingabout
  • joined 31 Mar'11 - 862 messages
  • england, United Kingdom

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Upcoming in the editorial calendar
WIRELESS CHARGING
Aug 2025
MANAGING MIXED FLEETS
Oct 2025