Like our mates told you, this problems generally comes from the three wires (think 70, 71, 72) of the charge battery level. If battery and wires is OK, replace A5 card

I found one case on a rrB6 series 16, that was neccesary to replace A5 logic card. Its very important the good state and tighten of negative thick wire that comes from batery to inverters. It's works like a shunt wire.

If you need any information, just ask for it.



Regards
  • Posted 27 Oct 2010 09:17
  • Modified 27 Oct 2010 09:28 by poster
  • By nacsand_n
  • joined 20 Sep'09 - 716 messages
  • Madrid, Spain

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Maxlion FD50T
Hangzhou, China
New - Sale
Unicarriers FD80-2
Yokohama, Japan
Used - Sale
Global Industry News
edition #1261 - 18 December 2025
In this week’s Forkliftaction News , we report on an activist investment firm increasing its stake in Toyota Industries Corp (TICO), in a bid to stop the privatisation of the materials handling equipment manufacturer... Continue reading
Upcoming industry events …
March 3-7, 2026 - Las Vegas, NV, United States
January 28-30, 2026 - Bangkok, Thailand
31 March 2026 - Dubai, United Arab Emirates
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Upcoming industry events …
March 3-7, 2026 - Las Vegas, NV, United States
January 28-30, 2026 - Bangkok, Thailand
31 March 2026 - Dubai, United Arab Emirates
Latest job alerts …
Bensenville, United States
Monmouth, IL, United States
Bensenville, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY