Report this forum post

am building an electric car. I have saved ALL of the electronic components from a old stand up forklift, and am in the process of installing them into a Geo Metro.

I have a GE 6.7" traction motor already bolted up to the transmission, and am ready to start the re-wiring process.

Now, I saved pictures of EVERY wire that was disconected, so I do know where everything goes......


The car will typically be driven in 1st. 2nd and 3rd gear, with an estimated top speed of 30MPH. Curb weight is 1900 - 2000LBS, but gearing is a bit taller than a conventional forklift.
Here is my cards info....
EV100T1TT1
serial number - PR LX-047766







The EV100 control panel was mounted on a steel surface with temperature conducting grease. It is NOW going to be mounted where there is alot of airflow. May I omit the plate behind it as a heat sink?
  • Posted 26 Jul 2010 23:50
  • By CrazyBry79
  • joined 26 Jul'10 - 5 messages
  • Wisconsin, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.