Report this forum post

For the RR5700 and RMD6000 go into the service menu, Features, F11.1 = Enable. Then go to F11.3 and set the timeout. You shouldn't have to set any user codes in F11.2 to my knowledge, but if you wanted to you could so that users have to enter a code to start up the lift. You can have 25 user codes that are 4 digits long.
It's basically a simple version of Infolink built into the lift.
  • Posted 4 Dec 2024 23:53
  • By DyslexicNerd_01
  • joined 13 Jun'23 - 222 messages
  • Wisconsin, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
Brothers Adolf ("Adi") and Rudolf ("Rudi") Dassler split their shoe company after WWII due to a bitter feud, and established the rival companies of Adidas and Puma. Their personal animosity and business rivalry divided their German hometown Herzogenaurach. The town became known as "the town of bent necks" due to the intense loyalty to each brand.
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Latest job alerts …
Davenport, IA, United States
Philadelphia, United States
Prospect CT, United States
Dayton OH/Cincinnati OH, United States