Report this forum post

I have a 4g63 single overhead cam in a catcg15 lift truck. removed the head for a valve job and now have to time the cam to the flywheel. i have two questions 1 this motor has a balance shaft or a silent shaft as its called, one website says you need to remove a plug on the side of engine block insert a screwdriver to make sure the oil pump is in the proper location.first time ive ran into this and 2 on the cam timing marks it says to line the pip on cam pulley two teeth before the mark on the block which could make sense becauce it fires 10 degrees btdc. thanks in advance
  • Posted 4 May 2023 08:44
  • By Daniel_Grue
  • joined 4 May'23 - 2 messages
  • New York, United States
Daniel Grue

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Ice 24INCH-AUTO-SCRUBBER
Morgantown, Pennsylvania, United States
Used - Sale
USD6,396
Aichi SR18A
Yokohama, Japan
Used - Sale

PREMIUM business

Libiao Robotics
Creating robotic warehouse solutions that automate and elevate your business.
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Ice 24INCH-AUTO-SCRUBBER
Morgantown, Pennsylvania, United States
Used - Sale
USD6,396
Aichi SR18A
Yokohama, Japan
Used - Sale
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY