Report this forum post

We have 3 phase in part of the building pretty far from the best charger location. We have single phase sub panel right at location.

Charger is a Applied Energy Workhorse Series 3.
If I can post or PM photos of the inside panel diagram...I can send that.
  • Posted 27 Feb 2018 02:56
  • By blueberrybob
  • joined 24 Feb'18 - 5 messages
  • Washington, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Latest job alerts …
Clinton, IA, United States

PREMIUM business

Bolzoni SpA (Group HQ)
Manufacturer of Lift Truck Attachments, Forks and Lift Tables, with the most extensive range in the market.
Upcoming in the editorial calendar
MANAGING MIXED FLEETS
Oct 2025
ASSET FINANCE
Nov 2025