Report this forum post

I had this problem this morning and corrected it. The code indicates the forward/reverse selector lever needs to be replaced.
  • Posted 29 Aug 2017 06:24
  • By Gprice0616
  • joined 29 Aug'17 - 1 message
  • GA, -

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Upcoming industry events …
September 24-25, 2025 - Tangiers, Morocco
September 25, 2025 - South Brisbane, QLD, Australia
October 23, 2025 - Atlanta, GA, United States
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Latest job alerts …
Danville, IL, United States
Upcoming industry events …
September 24-25, 2025 - Tangiers, Morocco
September 25, 2025 - South Brisbane, QLD, Australia
October 23, 2025 - Atlanta, GA, United States
Upcoming in the editorial calendar
MANAGING MIXED FLEETS
Oct 2025
ASSET FINANCE
Nov 2025

PREMIUM business

Tailift Material Handling Taiwan Co.,Ltd.
Focused simply for the new era.
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.