Discussion:
No travel, pulses 2-3 times then nothing

We have had 5 different techs look at this unit. Everything has been tested or replaced. Main and Aux Control cards replaced, SCR1,2 &3 replaced, capacitor replaced, both motors rebuilt, rec 1 replaced, speed limit module replaced. This all started when the cooling hose broke. First tech install incorrect hose and unit has not ran since. Replaced the cooling hose with non conductive and then all the following repairs and no change. We have gone through all the tests in the manual with no issues. Still when trying to travel F or R contacts with pulse 2-3 times and then nothing. Amp draw when pulsing is about 100-120 amps. The one thing we did find is that with the wire at TP23 disconnected unit will travel but with no modulation from the throttle and the M contactor does not close. I can't find any info about TP23 or what it is supposed to tell the controller. I think it is a load sense but not sure. Oh BTW the battery voltage is 37.5 static and when trying to travel drops to 35.
  • Posted 23 Feb 2023 07:27
  • By Aaron_Partlow
  • joined 23 Feb'23 - 5 messages
  • California, United States
Aaron P

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Manitou MH25-4
Braeside, Melbourne, Victoria, Australia
Hire
Nagano NUL120-6
Yokohama, Japan
Used - Sale
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine