Discussion:
No fuel coming from EPR

I just replaced the EPR because it was leaking around the housing, once replaced I can't get fuel from the EPR thru the hose, the lock off valve is working and getting plenty of fuel to the EPR, Just not getting fuel to the mixer. Machine will crank and run on starter fluid.
  • Posted 3 Jan 2025 11:53
  • By bruce864
  • joined 1 Mar'16 - 40 messages
  • Texas, United States
Showing items 1 - 1 of 1 results.
Bruce,

Since you had to remove a connector to install, verify all connections are good, clean and tight. Verify fuse 3 has not failed. This supplies power directly to the EPR. Since it starts on fluid, the EPR is no allowing fluid to enter the mixer. If everything checks good, suspect a bad EPR. Swap with a known good operating lift if you have a sister truck. Good Luck.
  • Posted 7 Jan 2025 00:02
  • By Fishmech
  • joined 12 Jul'17 - 370 messages
  • Virginia, United States
The hard to do we do right away. The impossible just takes a little longer.

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Fact of the week
The two internal cavities in our nose called nostrils function as separate organs. Each nostril has its own set of turbinates and olfactory receptors. The two independent organs work together through a mechanism called the nasal cycle, where one nostril is dominant for air intake while the other rests and is better at detecting scents.
Latest job alerts …
Monmouth, IL, United States
Bensenville, United States
Bensenville, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY

Showcased in the Virtual Expo

Latest job alerts …
Monmouth, IL, United States
Bensenville, United States
Bensenville, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY