Discussion:
Moving a dead Toyota electric forklift

I need to load a dead Toyota 5FBE18 electric forklift onto a tilt flatbed trailer. It doesn't have the battery and is basically scrap. I'm picking it up for the forks and spare parts.

Are there brake cables that need to be loosened before winching it backwards onto the flatbed? Or, are there other things that need to be done to get it to free roll?

Also, is there a way to steer the rear wheel when there is no power?

Thanks,
Jim
  • Posted 9 Jul 2024 11:37
  • By jj80909
  • joined 10 Jun'16 - 6 messages
  • Colorado, United States
jimjovan@gmail.com
Showing items 1 - 1 of 1 results.
Just an update...

I loosened the park brake cables as the brake discs were very rusty and dragging. Then I jacked up the rear of the lift, straightened the steer wheel and easily winched in onto the flatbed.

I started a new thread dealing with the C0 code the lift has.
  • Posted 11 Jul 2024 04:44
  • By jj80909
  • joined 10 Jun'16 - 6 messages
  • Colorado, United States
jimjovan@gmail.com

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Movers & Shakers
Andries Retief Andries Retief
Chief development officer, DHL
Director, ICHCA Australia
CEO, TVH
Sales and operations director, Logitrans A/S
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.