Discussion:
ERROR CODE FE52

Does anyone know what Error Code FE52 is. Truck ahs no tilt or sideshift?
  • Posted 15 Sep 2023 20:33
  • By john_harrison
  • joined 15 Sep'23 - 1 message
  • United Kingdom
Showing items 1 - 1 of 1 results.
From the manual.
FE52, Tilting potentiometer wire breakage
The two values of the setpoint potentiometer for DS/LS tilting (arm 1 and arm 2) are outside the monitoring range of 8.5 - 11V on addition.
Check the wiring between the potentiometer and the LAS module. If this is OK, replace the potentiometer or lever.
The tilting function is blocked.
  • Posted 21 Sep 2023 23:59
  • By Dez_A
  • joined 3 Jun'04 - 84 messages
  • Middlesex, United Kingdom
Service life of a forklift is proportional to how well it is maintained.

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Showcased in the Virtual Expo

Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group
Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading
Unicarriers FD80-2
Yokohama, Japan
Used - Sale
Tusk 500PGH16
Coraopolis, Pennsylvania, United States
Used - Sale & Hire
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group

Showcased in the Virtual Expo

Latest job alerts …
Dayton, OH, United States
Erie, PA, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY