Discussion:
Crown RD 5725-30, built 2011, error 601

I have a fleetmanagement installation on Crown RD 5725-30, all built 2011. The trucks have the 1-2-3 access controller. The installation was accepted by Crown on site in 2013.
Now the customer said, all trucks have a error 601 in the error log of the vehicle. The Crown techs on site will not explained the error or cause of problem, but keep telling it is because of the fleetmanagement system installed on the trucks.
Does anybody know what this error code means?
  • Posted 17 Mar 2015 02:19
  • By andreas_k
  • joined 22 Nov'09 - 6 messages
  • NRW, Germany
Showing items 1 - 2 of 2 results.
Some more information, the access control is connected to the power supply of the key switch. In case the driver is not signed in, heavy impact or no activity he is signed out and the power supply for the key switch is down. So the truck switchs off immediately. Can this be the cause for this error code? I also thought about incorrect start procedure.
  • Posted 17 Mar 2015 10:06
  • By andreas_k
  • joined 22 Nov'09 - 6 messages
  • NRW, Germany
fault is access #2 internal voltage out of range. Check cables and fuses that power modual and motors access controls. Also list possible bad cell in battery. If system installed deals with powering access then it could be the problem
  • Posted 17 Mar 2015 08:35
  • By popeye
  • joined 24 Nov'14 - 208 messages
  • Ohio, United States

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Taylor TX175
Coraopolis, Pennsylvania, United States
New - Sale & Hire
Enforcer FD50T-MMA
Braeside, Melbourne, Victoria, Australia
Hire
Latest job alerts …
Erie, PA, United States
Dayton, OH, United States
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group
Taylor TX175
Coraopolis, Pennsylvania, United States
New - Sale & Hire
Enforcer FD50T-MMA
Braeside, Melbourne, Victoria, Australia
Hire
Upcoming industry events …
January 28-30, 2026 - Bangkok, Thailand
March 4-5, 2026 - Detroit, Michigan, United States
March 24-26, 2026 - Stuttgart, Germany
Movers & Shakers
Jett Chitanand Jett Chitanand
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
Manager of automated solutions engineering and implementation, MHS Lift
President and CEO, Manitou Group
Taylor TX175
Coraopolis, Pennsylvania, United States
New - Sale & Hire
Enforcer FD50T-MMA
Braeside, Melbourne, Victoria, Australia
Hire
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY