Discussion:
BT RRE7 fault code E 131

Hello everyone! Im having trouble with this reach truck and i dont have a service manual for it. Can someone "translate" me the fault code (E 131) please. Ser N of the machine is 577788AA / 2003 year.

Thanks in advance!
  • Posted 26 Apr 2013 20:54
  • By mhonotone
  • joined 8 Feb'13 - 11 messages
  • Sofia, Bulgaria
mhonotone at gmail dot com
Showing items 1 - 2 of 2 results.
Sometimes you can find this fuse blown, but if fuse is OK check its wires from + battery to pin 901 in A5 and these cables connector in A5.

fail the liitle contacs in small relay inner A5. If error persists replace A5.

Regards
  • Posted 27 Apr 2013 07:17
  • By nacsand_n
  • joined 20 Sep'09 - 716 messages
  • Madrid, Spain
Error testing safety relay (steering) at start-up
Error mode - Steering error
Error cause
1. Defective fuse F61
2. Defective wiring for F61
3. Defective electronic card A5
  • Posted 27 Apr 2013 00:11
  • By Leon_W
  • joined 7 Sep'07 - 326 messages
  • Tyne & Wear, United Kingdom

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine
Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY