Discussion:
Event code 474 RM d 6000 series

I'll keep it short and simple. During reach extend operation, lift throws a wrench (icon) and gives an event code 474. Reach and side shift are both locked out from operation, but a power cycle (off/on) clears the error. I am concerned because our previous shift just had the reach hose break open today, and there was no sign of stress nor cracking on the hoses that blew. I hand-inspect every inch of my truck (like you are supposed to do!) at pre-operation.

Probably from teammates "bulldozing" pallets with the reach cylinders partially or fully extended.

I am able to access the Access 2 screen if there is a calibration I can run on the reach cylinders, but I'd be lying if I said I'd know what I was doing! Any and all help is welcome, thanks!
  • Posted 28 Mar 2017 14:29
  • By Raina
  • joined 5 Mar'17 - 6 messages
  • Indiana, United States
Showing items 1 - 1 of 1 results.
Analyzer menu, A2.4.20.1....voltage range is 0.7 - 4.5. Reach and retract slow to see if numbers go up and down smoothly...or jump around. If it's smooth, then calibrate. C1.3. If it's irregular, then check wire connections first. Replacement also requires calibration, C1.3.
  • Posted 15 Apr 2017 07:46
  • By Ifixit
  • joined 30 Jan'17 - 174 messages
  • Pennsylvania, United States

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Global Industry News
edition #1251 - 9 October 2025
In this week’s Forkliftaction News , hydrogen power is a theme as we report on the US marking its 10th annual National Hydrogen and Fuel Cell Day, an initiative to promote the benefits of the clean energy source... Continue reading
Global Industry News
edition #1251 - 9 October 2025
In this week’s Forkliftaction News , hydrogen power is a theme as we report on the US marking its 10th annual National Hydrogen and Fuel Cell Day, an initiative to promote the benefits of the clean energy source... Continue reading
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY