Report this forum post

typically an open in the overmast cable.
the reach solenoid is right infront of the cluster on top of the carriage under a plate with 2 bolts holding it down. some techs use 18/8 overmast cable. if so there is 2 extra wires in the cable you can substitute the reach solenoid wire for the time being to prove its the cable.
  • Posted 31 Mar 2016 09:38
  • By stam
  • joined 12 Aug'12 - 779 messages
  • Ontario, Canada

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
In March 2002, identical twins in Finland died on the same day in similar accidents within hours of each other. A 70-year-old man was killed by a truck while cycling; hours later, his twin brother was killed by a truck on the same road, about a mile away, before the family had been informed of the first accident.
MLA launches new electric forklift Houston, TX, United States
Latest job alerts …
Oxford Ct, United States
New York Staten Island, United States

Showcased in the Virtual Expo

Fact of the week
In March 2002, identical twins in Finland died on the same day in similar accidents within hours of each other. A 70-year-old man was killed by a truck while cycling; hours later, his twin brother was killed by a truck on the same road, about a mile away, before the family had been informed of the first accident.
Unicarriers FHGE35T5S
Yokohama, Japan
Used - Sale
Ncn 110TH
Ncn 110TH 2015
Balling, Denmark
Used - Sale

PREMIUM business

Noblelift
Global leader and manufacturer of high quality electric, lithium-ion, and IC material handling equipment.
Latest job alerts …
Oxford Ct, United States
New York Staten Island, United States
Movers & Shakers
Esie Cortez Esie Cortez
Vice president - IT & EP OEM parts, Big Joe Forklifts
Vice president of finance, Exotec
President - business area industrial equipment, Konecranes
Board chair, Equipment Leasing & Finance Association