Report this forum post

I have 2 Still forklift: RX20 sr: 516215Z26325 (truck 1)

RX20-20 sr: 516215015589 (truck 2)

Truck 2 show error code T22,94. So I change SU (Supply unit) from truck 2 to truck 1 and the display only show the symbol "man running" and I wait for around 30' but the symbol still remain.

Then when I install the SU (of truck 1) back the same result I had("man running").

I checked the display and see the model for display of truck 1 is ABE2 and truck 2 is show "not available"at ABE type.

When I connect diamon software to truck 1 and I saw at "ABE type" showed ABE1 then I changed this one to ABE2 and we have a better result is the "man running" disappeared and contactor closed(before contactor not closed). but then truck can only move and hydraulic function and steering is disable.

If any one have experiance on this matter, Pls help me.
  • Posted 1 Sep 2011 04:44
  • By johntran
  • joined 28 Dec'10 - 3 messages
  • HCM, Viet Nam

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Fact of the week
The two internal cavities in our nose called nostrils function as separate organs. Each nostril has its own set of turbinates and olfactory receptors. The two independent organs work together through a mechanism called the nasal cycle, where one nostril is dominant for air intake while the other rests and is better at detecting scents.
Movers & Shakers
James Brown James Brown
Chief operating officer, Bulldog Battery Corporation
Commercial excellence roll-out manager, TVH Parts
President EPG Americas, Ehrhardt Partner Group (EPG)
CEO, Duravant
SMV (Konecranes) 4632CC5
Balling, Denmark
New - Sale
Maxlion FG25
Hangzhou, China
New - Sale

PREMIUM business

ROYPOW
Manufacturer of lithium forklift battery solutions, the global leader in the market of lithium batteries replacing lead acid batteries.
Latest job alerts …
Bensenville, United States
Bensenville, United States
Monmouth, IL, United States
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY