Report this forum post

Hello. Just bought a 1998 cgc25. After about 2 ft of lifting roughly 2000lbs off the ground, the secondary cylinders start raising up and the main cylinder starts bleeding down. Can someone please tell my if it's the main cylinder or spool valve or any other ideas? Thank you.
  • Posted 6 Oct 2024 13:19
  • By John_Phillips
  • joined 6 Oct'24 - 12 messages
  • Washington, United States
John phillips

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
Upcoming industry events …
September 24-25, 2025 - Tangiers, Morocco
September 25, 2025 - South Brisbane, QLD, Australia
October 23, 2025 - Atlanta, GA, United States
Movers & Shakers
Andries Retief Andries Retief
Chief development officer, DHL
Director, ICHCA Australia
CEO, TVH
Sales and operations director, Logitrans A/S

PREMIUM business

Tailift Material Handling Taiwan Co.,Ltd.
Focused simply for the new era.
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.