Report this forum post

SINCE FURTHER SHORT TESTING I FOUND THE TRATION MOTOR CABLE A2 REMOVED FROM MOTOR LABLED MD-A2 SHOWING CONTINUITY AT THE NEG STAND OFF ABOVE HEAT SINK WHICH IS ALSO CONNECTED TO Q1 BIG E TERMINAL. CABLE TP 4 GOING TO HYDRAULIC MOTOR ON TOP LEFT SIDE AND DOWN TO I BELIVE POWER STEERING MOTOR ABOVE TRACTION MOTOR. I GOING TO CHECK IT NEXT. I HOPE I'M ON THE RIGHT TRCCK NOW
  • Posted 21 Apr 2020 06:42
  • By Hdsprt
  • joined 12 Nov'15 - 43 messages
  • Illinois, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Latest job alerts …
Wentzville, MO, United States
Harrisburg, SD, United States
Ottumwa, IA, United States
Upcoming in the editorial calendar
WIRELESS CHARGING
Aug 2025
MANAGING MIXED FLEETS
Oct 2025
Global Industry News
edition #1235 - 19 June 2025
Greek philosopher Heraclitus is credited with the famous saying “change is the only constant”, and this week’s Forkliftaction News demonstrates this is certainly true in the case of the materials handling sector... Continue reading
Fact of the week
Bluetooth is named after the 10th-century Viking king, Harald Bluetooth, who united warring tribes in Denmark and Norway. In 1997, Jim Kardach from Intel gave the name to the technology because of its ability to unite different communication protocols, just as Harald united various tribes.
Upcoming industry events …
July 22-24, 2025 - Sydney, Australia
November 11-13, 2025 - Singapore, Singapore
November 12-13, 2025 - London, United Kingdom
Latest job alerts …
Harrisburg, SD, United States
Wentzville, MO, United States
Ottumwa, IA, United States