Report this forum post

These units have a zapi controller from what it looks like so:
there is no adjustable settings for voltage, it is already loaded into the configuration file in the firmware of the controller.
If you have a PC hookup you can get the factory config file and reload it into the controller and see if that fixes it.
otherwise the only thing you can change with the handset is drive parameters, or use the 'tester' function to monitor other operations for inputs and outputs. (you could go into that and see what the actual voltage is registering as and also check the percentage of the batterys). To see if they are registering correctly.
  • Posted 7 Jan 2020 00:31
  • Modified 7 Jan 2020 00:31 by poster
  • By swoop223
  • joined 23 Mar'12 - 3,691 messages
  • North Carolina, United States
You've been swooped!
swoop223@gmail.com

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Taylor TX175
Coraopolis, Pennsylvania, United States
New - Sale & Hire
UN Forklift FGL25T
HANGZHOU, Zhejiang, China
New - Sale
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Movers & Shakers
Andries Retief Andries Retief
Chief development officer, DHL
Director, ICHCA Australia
CEO, TVH
Sales and operations director, Logitrans A/S
Upcoming industry events …
September 24-25, 2025 - Tangiers, Morocco
September 25, 2025 - South Brisbane, QLD, Australia
October 23, 2025 - Atlanta, GA, United States
Latest job alerts …
Danville, IL, United States
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.