Report this forum post

yeah i've dealt with these before and seen the guys in the shop take these apart and that extra channel just takes up more room so workable space is even smaller so removing those main cylinders is even tighter. The problem is in the crossbars at the top and middle that get in the way when trying to pull the cylinder out, that's why if i didn't have to repack the whole cylinder i just did the gland nut at the top if it was just leaking and not drifting down.
  • Posted 17 Feb 2019 02:36
  • By swoop223
  • joined 23 Mar'12 - 3,692 messages
  • North Carolina, United States
You've been swooped!
swoop223@gmail.com

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
TCM FD115-3
Yokohama, Japan
Used - Sale
Terberg RT223
Balling, Denmark
Used - Sale
Latest job alerts …
Muncie, IN, United States
Upcoming industry events …
February 5-7, 2026 - Mumbai, India
April 14-16, 2026 - São Paulo, Brazil
June 9-11, 2026 - Johannesburg, South Africa
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.

PREMIUM business

F. Uchiyama
Global exporter of used forklift and construction machinery, servicing over 80 countries.
Latest job alerts …
Muncie, IN, United States
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine