Discussion:
Nissan P02 Issues...

Model: CWP02L25S. SN: CWP02-9C2823
Turn Key switch on and Contactor pulls in but dash dosent light up and has no FWD/REV or Hydraulics.....lights and horn work and if shift lever is put in Reverse the back up alarm comes on....operator just took it off the charger and plugged it in but it won't do anything other than I just stated....Main power fuses all good...battery voltage is good @ 38.2 Volts(36 volt battery).
Fuse box in the controller are with the ATF style fuses...all them check good...have battery voltage on both sides of the main ( 275 amp) fuses and the power steering fuse(50 Amp).....any touts or ideas where to go from here???? I DO have the schematic and the CS and EL sections of the manual....
  • Posted 19 Jun 2013 08:44
  • By kevin_t
  • joined 2 Dec'10 - 1,301 messages
  • Pennsylvania, United States
Showing items 1 - 5 of 5 results.
The unit should run without the meter panels or meter panel printboard installed as this is not a CAN BUS set up.
  • Posted 20 Jun 2013 11:56
  • By RCAV8TOR
  • joined 12 Nov'11 - 366 messages
  • Alabama, United States
What i used to do all day now takes me all day to do.
As MR stated, check seat switch. Possibly unplugged short harness on seat or possibly unplugged from seat switch. If all good then check the cabin relay ( located beside horn relay underneath floor pan on left side). I am on the same page as MR since dashlight do not light up. Be sure to double check the 20 amp atc fuse in the f box if truck is equipped with a brake booster set up also.
  • Posted 20 Jun 2013 11:31
  • By RCAV8TOR
  • joined 12 Nov'11 - 366 messages
  • Alabama, United States
What i used to do all day now takes me all day to do.
will check those this AM when I get back to the truck......first time working on this control system so.......
  • Posted 19 Jun 2013 20:06
  • By kevin_t
  • joined 2 Dec'10 - 1,301 messages
  • Pennsylvania, United States
Kevin t;
Do you have a seat switch issue? Do you have battery voltage at the orange and yellow wires of the meter print board?
  • Posted 19 Jun 2013 16:25
  • By MEngr
  • joined 15 Jan'11 - 247 messages
  • Missouri, United States
ALSO the fusible links at the negative termination look good and not burnt or anything...or will the break internally and only way to check is ohming them???
  • Posted 19 Jun 2013 09:57
  • Modified 19 Jun 2013 09:58 by poster
  • By kevin_t
  • joined 2 Dec'10 - 1,301 messages
  • Pennsylvania, United States

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Global Industry News
edition #1255 - 6 November 2025
In this week’s Forkliftaction News , Hyster-Yale says it is reducing production because of “softer demand” as it reports revenue for Q3 was USD979 million, a drop both year-on-year and quarter-on-quarter... Continue reading
Fact of the week
In Germany, the 9th of November is sometimes called Schicksalstag, the "Day of Fate" because it has been the day for several major historical events, including the horrors of Kristallnacht in 1938 and the fall of the Berlin Wall in 1989.
Crown WP302020
Braeside, Melbourne, Victoria, Australia
Hire
UN Forklift FB25N1QZ1
HANGZHOU, Zhejiang, China
New - Sale
Latest job alerts …
Muncie, IN, United States
Movers & Shakers
Deborah Baker Deborah Baker
Board chair, Equipment Leasing & Finance Association
Vice president of manufacturing operations, Hytrol Conveyor Company
VP sales Europe, EP Equipment Europe
Group president - Vancouver operations, Columbia Machine