Report this forum post

PM is for planned maintenance. Use the idea of down time if a problem is not caught before it causes the machine to quit. Gives time to plan for an expense if you point out a repair is needed soon. Just the knowledge that your lift is in good order and not on the verge of a major failure should give the owner a better feeling. Also a safety inspection is done during PM's.
  • Posted 11 Jan 2007 10:52
  • By BigHusky
  • joined 14 Sep'06 - 6 messages
  • Washington, United States

This is ONLY to be used to report flooding, spam, advertising and problematic (harassing, abusive or crude) posts.

Indicates mandatory field
Toyota 8FD45
Yokohama, Japan
Used - Sale
Maxlion R2D35
Hangzhou, China
New - Sale
Upcoming industry events …
January 28-30, 2026 - Bangkok, Thailand
March 4-5, 2026 - Detroit, Michigan, United States
March 24-26, 2026 - Stuttgart, Germany
Editorial calendar - planned features
CONSTRUCTION FORKLIFTS
HANDLING GOODS IN THE COLD
LOADING/UNLOADING FREIGHT
BROWNFIELD AUTOMATION
FORKLIFT ATTACHMENTS
BATTERY AFFORDABILITY AND LIFETIME
FORKLIFT SAFETY
Upcoming industry events …
January 28-30, 2026 - Bangkok, Thailand
March 4-5, 2026 - Detroit, Michigan, United States
March 24-26, 2026 - Stuttgart, Germany
Global Industry News
edition #1260 - 11 December 2025
In this week’s Forkliftaction News we report on DHL Supply Chain signing a deal to deploy autonomous mobile robots (AMRs) at its Mexican retail operations and look at Guidance Automation’s successful trial of an AMR with a hydrogen fuel cell... Continue reading