Discussion:
Hyster 2.50 lpg vaporiser

Hi guys

I have a hyster 2.50 lpg with the mazda fe engine. Its currently not running. I need some help regarding the lpg vaporiser, i believe that there should be a vaccum line to allow the gas to flow through when engine is cranked and running. There is a line currently connected but it goes the the front of the rocker cover? Which i assume is pressure from engine crankcase. Is this correct or has someone gone wrong somewhere

Any help would be great

Thanks
Matt
  • Posted 27 Nov 2021 21:06
  • By Matthew_Morgan
  • joined 27 Nov'21 - 10 messages
  • United Kingdom
No smoke no poke
Showing items 1 - 1 of 1 results.
Matthew,

Vacuum line should go to the mixer, close to the mounting bolts. It will look like a silver shaft, but has a hole for vacuum line.
  • Posted 11 Dec 2021 06:21
  • By Fishmech
  • joined 12 Jul'17 - 370 messages
  • Virginia, United States
The hard to do we do right away. The impossible just takes a little longer.

Post your Reply

Forkliftaction accepts no responsibility for forum content and requires forum participants to adhere to our rules of conduct. Click here for more information.

If you are having trouble using the Discussion Forums, please contact us for help.

Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
Global Industry News
edition #1247 - 11 September 2025
In what may prove to be a sign of things to come, Canadian materials handling equipment lithium-ion battery manufacturer, UgoWork, has announced battery assembly for some forklifts bound for the North American domestic market will now be done in the US. See the story for full details... Continue reading
Enforcer FLBAXT25
Braeside, Melbourne, Victoria, Australia
Hire
Rail King RK330
Coraopolis, Pennsylvania, United States
New - Sale
Fact of the week
At the opening ceremony of the Sydney Harbour Bridge in 1932, marching bands were instructed to walk out of step as they crossed the bridge. This unusual directive was given as a precaution due to concerns about the bridge's structural integrity during its early use.
Enforcer FLBAXT25
Braeside, Melbourne, Victoria, Australia
Hire
Rail King RK330
Coraopolis, Pennsylvania, United States
New - Sale